...or, a few things straight--and level too. On a foggy morning, an eastbound coal drag heads toward Baltimore past a work in progress. The high-speed switch and track on the right will eventually be pushed into place and be re-attached to Track #2 (after they smooth the bumps out). For additional details of the ongoing track work at St. Denis, see my albums, "St. Denis, MD--High-speed switch assembly" and "CSX track maintenance." |
Date:
1/15/2007 |
Location:
Saint Denis, MD |
Views:
221 |
Collection Of:
George C Johnson |
|
Author: George C Johnson
|
|
Picture Categories: Track |
This picture is part of album: St. Denis, MD, 2007 |