Unfortunately the local had a GEVO today as there was a W943 scheduled to go south the day after. The unit dropped off its consist on the main, then ran down the siding to assist mechanical with an autorack that M209 had bad ordered the night before. The unit pulled up to the reservoir signals then reversed into the siding. The train still had work to do north of Deshler in Custar, but the unit would be wyed around the southwest and southeast wyes before it would continue north long hood forward. |
Date:
6/20/2023 |
Location:
Deshler, OH Map ![Show Deshler on a rail map](/images/map_us.gif) |
Views:
78 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Jacob Werling |
Locomotives: |
Author: Jacob Werling
|
![CSX 3246](/pictures\148239\DSC_8822.jpg) |
Picture Categories: |
This picture is part of album: The Longest Day: Deshler, OH. 6/20/2023 |