Made to Wait         
This picture illustrates the benefits of ownership. KCS owns the Laredo International Bridge, so the UP train you see in the background will wait for a while longer to cross into Mexico even though it arrived a long time before the KCS train in the foreground. Two other UP trains would wait with the background train for this KCS stack train to cross.
Date: 2/23/2023 Location: Laredo, TX Views: 96 Collection Of:   Andrew Barlow
Locomotives: KCSM 4099(SD70ACe) UP 8058(AC45CCTE) UP 2613(ET44AH) UP 7128(AC44CW)    Author:  Andrew Barlow
Made to Wait
Picture Categories: Roster,Yard,Track,Action This picture is part of album:  2023 Railfan Photos
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5952568