Two Empire corridor locomotives bracket the train because they need to be third rail compatible after Croton Harmon. The train is bracketed because the station stop in Rutland, VT is configured so that the train reverses orientation pulling out of Rutland Amtrak Station enroute to Albany Rensselaer and points south. |
Date:
7/31/2022 |
Location:
Burlington, VT |
Views:
102 |
Collection Of:
Bob Krug |
Locomotives: |
Author: Bob Krug
|
|
Picture Categories: Scenic,Passenger,Action |
This picture is part of album: Amtrak Ethan Allen express in Burlington, VT |