Span was built as part of Southern Railway's "Lynchburg cut-off" to bypass the grades and congestion of the original line through downtown Lynchburg. Line opened for traffic on March 1, 1911. |
Date:
3/21/2018 |
Location:
Lynchburg, VA Map ![Show Lynchburg on a rail map](/images/map_us.gif) |
Views:
177 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
G. R. Harper |
|
Author: G. R. Harper
|
![Looking up at the outside of the curved of the Blackwater Creek trestle](http://s3.amazonaws.com/rrpa_photos/126820/Bwater%20trail%20-%20outside%20curve%20trestle.%20%2021MAR2018.%20%201240.jpg) |
Picture Categories: |
This picture is part of album: Trains and scenes in the snow in Lynchburg, VA |