From Lambert east, the NCS is double tracked.
Our waiting train is on the other side of the bridge.
Date:
7/10/2016
Location:
Barberton, OH
Views:
44
Collection Of:
Fred Stuckmann
Author:
Fred Stuckmann
Picture Categories: Signal
This picture is part of album:
CSX New Castle Sub MP135.
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4505604