This bridge was buhlt to the super elevation. Rare to see. The new beam is level. Ballast will put in the new super elevation. |
Date:
3/16/2008 |
Location:
Vincennes, IN Map ![Show Vincennes on a rail map](/images/map_us.gif) |
Views:
186 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Brian Vieck |
|
Author: Brian Vieck
|
![Replacing a bridge built in the 1950's](http://s3.amazonaws.com/rrpa_photos/47331/P3160895.JPG) |
Picture Categories: |
This picture is part of album: Replacing a bridge on CSX |