Here the switch is straight railed. The factory will close this fall, so no need for the switch. The points will come out later. |
Date:
7/24/2008 |
Location:
Vincennes, IN Map  |
Views:
281 |
Collection Of:

Brian Vieck |
|
Author: Brian Vieck
|
 |
Picture Categories: |
This picture is part of album: Taking out the busted frog of a switch. |